Canyon Bridge

DESIGN, FABRICATION AND CONSTRUCTION OF PEDESTRIAN SUSPENSION BRIDGES

Keystone Gorge Bridges

Telluride, Colorado

keystone upper bridge.jpeg

Steel Stringer Bridge

  • Owner: The Nature Conservancy / San Miguel County

  • Built: 2009

  • River Crossing: San Miguel

  • Span: 70’ w/ Center Rock Support

  • Structural Deck Beams: (2)- W12x35’s

  • Deck: 3’ Treated Timbers

keystone lower bridge.jpeg

Suspension Bridge

  • Owner: The Nature Conservancy / San Miguel County

  • Built: 2009

  • River Crossing: San Miguel

  • Span: 90’

  • Deck: 3’ Wide Timbers

  • Main Cable: 1 1/4” diameter IWRC